01SportChic
Active Member
So I finally got the car in the shop this past Saturday, and got some of the piping up. I tacked it all together with the mig, then pulled it all off so I'll be welding it all together with the tig this Thursday on my day off. I'll keep you guys guessing as to how the setup will come out to
. I forgot to get more pics of the driver side, but we got the down pipe and turbo -> headers both just about past the a-arms.....
p.s. don't make fun of my welding on the turbo flange...that was my first time using filler rod with the Tig :X LOLOL
Pass. side v-band
Under the turbo, Downpipe started
Pass. Side turbo -> Headers
Driver Side Downpipe
I just thought this was funny. The inner pipe is my 3" downpipe inside of one of my b/f's customer's 4 1/2" downpipe LOL! :violent4:
p.s. don't make fun of my welding on the turbo flange...that was my first time using filler rod with the Tig :X LOLOL
Pass. side v-band
Under the turbo, Downpipe started
Pass. Side turbo -> Headers
Driver Side Downpipe
I just thought this was funny. The inner pipe is my 3" downpipe inside of one of my b/f's customer's 4 1/2" downpipe LOL! :violent4: