CompOrangeSN95
Well-Known Member
Just some more pictures of the project, I just got the sub-frame connectors in, they still need to be welded... I'm ready to tackle the roll cage.
engine needs some TLC
welded 1"x1" square tubing to the sub-frame connectors before installing them so I could jack the car up from any point on the side.
The new brakes are a tight fit but 5/8" spacers should give me enough clearance for any deflection I might see at the track
before paint
painted it in the paint booth at the machine shop i work at came out pretty nice, gotta love competition orange
engine needs some TLC
welded 1"x1" square tubing to the sub-frame connectors before installing them so I could jack the car up from any point on the side.
The new brakes are a tight fit but 5/8" spacers should give me enough clearance for any deflection I might see at the track
before paint
painted it in the paint booth at the machine shop i work at came out pretty nice, gotta love competition orange