I didn't work on the car too much yesterday and today, but I did some stuff...
Here's pics of the completed headliner and sun visors. The trim is now complete around the roof. All of it was painted so it all looks nice and new.
I had the visor holders coated satin black so they blend in.
Battery Box completed pics. Looks much better black.
Got the fuel system buttoned up. This was kind of a chore because stuff wasn't fitting where I wanted it to. I still may have to move it depending on how the air inlet fits, but at least it's to the point where it can be pressure tested for leaks. The wires for the fuel pressure gauge will need to be lengthened to reach it.
Here's some pics from last weekend when Croke was wiring up the Croke Dash. Because of the complexity of all the LED lighting and the Nexus Gauges that all need to be networked together, it took about ten hours.
Now I'm trying to put all the wires in loom, generally clean it up and organize it, and install the cluster.
My rear seat delete and rear package tray should be here from LRS this week. I'm looking forward to getting that because once that's installed, I can put in the console, the harness bar, and the seats, which will make a huge difference in how the interior looks.
More to come...
Paul.