DropTopPony said:0 dollars for labor.
Duff Daddy said:At our labor rate 81.00 its $1190.7 You need to remember this is the time to R&R teh motor, then R&R the heads, so they ad alot in there. but personally I can have the motor dorpped out the bottom with the trans attached in about 2 hours or so with a good friend.
Vermilion said:ill be charging myself 2 gatorades, a redbull and a sammich.